Lifting operations must be controlled by establishing a safe system of work, as required by the Health & C
Safety at Work etc. Act 1974. We ensure that all work is undertaken in accordance with BS7121 Code of O
Practice for the Safe Use of Cranes and Lifting Operations and Lifting Equipment Regulations (LOLER).
We also offer a contract lifting service, which includes the supply of an Appointed Person, to have total N
control of the lifting activity. T
Other advantages of our contract lifting services are: R
A
Single Point Responsibility C
Manage risk to BS7121 and LOLER
T
L
Specific Risk Assessment and Method Statement I
F
Quality assured ISO 9001 T
I
Fully planned service with AutoCAD rigging N
and crane drawings G
Trained and experienced team including CPCS Tandem lifting of gantry on
the Humber Bridge
Appointed Persons, Slingers/Signallers and
Crane Operators
Temporary road matting
Traffic control
I’d like to thank everyone
that was involved in
organising the crane at
such short notice,
especially the crane driver
for going above and
beyond what was expected
of him and for staying until
the job was fully Removal and installation of
completed. vegetable oil tank
GDF Suez
15 ton Pick & Carry
CRANES FOR HIRE: C
15 ton - Pick & Carry R
55 ton Terex
25 ton - Tadano A
50 ton - Tadano N
55 ton - Terex E
65 ton - Tadano H
I
90 ton - Tadano R
110 ton - Tadano 160 ton Terex E