Bedford Biomass Power Plant 006

Project Biomass Power Plant
Location: Bedford
Client: Bioflame
Project Value: £150,000
Package: Structural Concrete/ Drainage & Pavements
Project Detail:

Sangwin took on the role of principle contractor to safely control the specialist contractors in a site environment. The scheme involved Sangwin working closely with the client and civil engineers on a fast-track programme to ensure the project was ready on time.

Sangwin also undertook the important role of cost engineer, pricing up each new set of drawings within a week to keep the funders aware of the changing cost. We produced a 3D CAD model of the 5m bunker walls to ensure we incorporated all of the specialist steel work into each stage of the concrete pours.