green energy

Project Biodiesel Plant Download PDF
Location: Henderson Quay, Immingham Docks
Client: Desmet Ballestra s.p.a.
Project Value: £2.2 million
Package: Civil Engineering/Structural/Concrete/Drainage & Pavements
Project Detail:

Construction of a tank farm, monitoring station and the roads and sewers for Simons Storage to service the BIO Plant. Phase 2 won the European Construction Institute (ECI) Project of the Year Award in 2008, Sangwin was named as one of the main subcontractors.

These, madam, are the proper points of important hyperlink consideration in the person
Website designed & built by The One Point
© Sangwin Holdings Ltd