Project: Installation of Steelwork onto East Stand to Support New Lighting SystemsDownload PDF
Location: KC Stadium, Hull
Client: Superstadium Management Company Ltd
Package: Provision of 160 ton Crane
Project Detail: Using our 160 ton Terex Crane with 46 ton ballast and 68 metres main boom, various steel sections were lifted from outside the stadium over the East Stand and then held whilst they were secured. Following this, new floodlights were fitted to the supporting steelwork. The 160 ton Terex is the largest crane in East Yorkshire and it was ideal for the requirements of the KC Stadium, carrying out the lift both efficiently and effectively.

 


 

The queen, as one of the http://www.pro-homework-help.com most shining representatives of god on.
Website designed & built by The One Point
© Sangwin Holdings Ltd