• Before Before
  • After After

Project Racing Stables, MaltonDownload PDF
Location: Malton
Client: R Fahey
Project Value: £24,000
Package: Redi-Rock
Project Detail:

The project was undertaken at RF Racing Ltd in Malton. Redi-Rock was chosen after the contractor compared and favored both the costings and superior finish of Redi-Rock as opposed to gabions.

The contractor was impressed by the advantages of Redi-Rock. Not only did it provide a retaining wall with a look of natural stone to blend into the existing landscape, but it also provided crucial savings in time and money.

The overall project took 6 days to complete and the saving was 43% compared with the same project using gabions.

Allerdings wird ihre arbeit von einem promovierten wissenschaftler aus ihrem fachgebiet verfasst, sodass sie mit einer hochwertigen arbeit rechnen knnen erstellen sie auch passende grafiken und diagramme Ich las es hier
Website designed & built by The One Point